What the agent did this morning
It refreshes every public source, checks what other programs already cover, runs the demand model on our own delivery history, and drafts one plan. It stops there — nothing leaves this screen without a coordinator's sign-off.
Sources it touched
- Feeding America
- Map the Meal Gap 2024
- USDA
- FARA 2019 · SRAM 2025
- USDA
- Food Environment Atlas
- Census
- ACS 5-year, block group
- City of Chicago
- food inspections feed
- 211 directory
- 86 registered programs
- OpenStreetMap
- illinois-latest.osm.pbf
Demand forecast
Households expected at each stop this week. The model learns from our own fifteen-month delivery log; the public indicators tell it which neighbourhoods are moving.
pantry-demand-ft · v3
- Base model
- Chronos-Bolt small, 48M
- Fine-tuned on
- 18,412 stop-weeks, 34 sites
- History
- Jun 2023 – Aug 2026
- Covariates
- FARA tract flags, ACS BG, Atlas
- Last retrain
- 31 Aug 2026
- Next retrain
- 28 Sep 2026
Anything the model wants to move more than 35% week over week is held back and sent to sign-off instead of into the plan.
Accuracy on the last 12 weeks
Against the old method
Same-week-last-year, which is how routes were set before.
By stop
Proposed route
Two box trucks, ten stops, Tuesday through Thursday. Stop order is drive-time only — move anything that clashes with a site's own schedule.
Stock to load
Built from the forecast at our standard 15.4 lb per household, then checked against truck payload. Adjust in the warehouse sheet after sign-off.
Truck payload
Coordinator sign-off
Every stop needs a decision before the plan goes to the warehouse and the volunteer captains. Four stops are marked because the agent would not decide them on its own.
Decision log
- Nothing logged yet. Run the plan to start the week.
Data health
What came down this morning, and what broke. Two things are degraded and the plan says so rather than hiding it.
Drive times are straight-line distance with a 1.32 road factor, because pyosmium is not installed in the worker and the Illinois extract could not be opened. Expect ±8 min per leg.
Map the Meal Gap is the cached 2024 release; the licensed 2025 file has not been placed in the bucket. County-level gap rates are 14 months old.